A field command center
in every project.
Every Fieldbase project ships with a dedicated Fieldwork tab — the project manager's cockpit while the survey is in field. See live dispositions, IR / CR / LOI and the daily trend. Nudge quota targets or close a cell inline — the programmer's Quota tab and this view share one table, so edits sync both ways. Flip the whole project to Test · Live · Paused · Closed with one switch, hold a single language back while others keep going, and copy the live links or the published report links from the same panel.
The four questions your PM asks every morning,
answered on one screen.
Where are we on completes? How many got screened out? How many are in the middle right now? And are any cells already full? The Fieldwork tab opens on exactly those four, pulled live from respondent_state — not a cached dashboard that lags the real pool.
- Live dispositions. Completes, Terminated (screenout + badcomplete), In progress, Quota full. Pulled on page load and refreshed as respondents complete — real pool only, no testers.
- Field metrics in the sidebar. IR = qualified / screened, CR = completes / entrants, LOI avg and median, in-progress share, and the daily completion rate average.
- A daily-completes trend. 14-day sparkline from paradata so you can see whether yesterday's push stuck, without opening a BI tool.
The programmer sets the groups.
The PM runs them.
The Quota tab is where someone with a scripting hat lays out the groups and names the cells. The Fieldwork tab is where the person minding the field sees how those same cells are filling and dials the targets as the situation changes. Same table underneath — edits in one show up in the other on the next refresh.
- Change a target inline. Edit a cell's target, hit Save changes — the engine starts gating against the new number. No republish, no cycle.
- Close a cell with the toggle. Flip Open off and the cell goes to
active = false; the engine counts only active cells. Closed cells stay visible, dimmed, with a reopen arrow — nothing is destructive. - Both views stay in sync. Edits from Fieldwork land in the same
quota_cellsrows the Quota tab reads. Programmers and PMs look at one truth.
See the authoring side: Quota engine →
quota_cells — both tabs see it next refresh One switch for the whole project.
Shared with Settings so there's never a second truth.
A single Test · Live · Paused · Closed control sits in Fieldwork and in Settings, both backed by the one projects.status. Flip it from either side; the entry gate for respondents reacts immediately.
- Live needs a published artifact. You can't flip to Live until the survey has been published at least once — the API returns 409 and the toggle refuses the move until Builder publishes.
- Paused and Closed show a hold page. Any respondent arriving at
/s/:sidsees the appropriate hold page instead of the survey. The gate fails open on infrastructure errors — a database hiccup doesn't drop fielding. - Testers walk through regardless.
?tester=1plus a tester?rid=pv-keep you working on a paused or closed project — so QA doesn't stop just because fielding does.
/s/pid-00127?tester=1&rid=pv-qa-001 projects.status Launch English Monday.
Add French when the translation review is through.
Each translation carries its own fielding gate. You can hold one language back while others keep collecting, bring up new languages as reviews land, and close a market without ending the project. One master status, per-language overrides for everything else.
- Each language is independently gated. Respondents landing on
?lang=frhit the French gate — Paused in French has no effect on English respondents still coming in. - Inherit by default; override when needed. A language starts tracking the master status. Set an override and the UI marks it with an accent border — easy to see at a glance which ones have diverged.
- Set from Fieldwork or Settings. Either place writes the same
project_languages.fielding_statuscolumn; Fieldwork keeps you one click from the quota view, Settings keeps the share-links together.
https://thefieldbase.com/s/pid-00127?lang=en-US https://thefieldbase.com/s/pid-00127?lang=fr-FR respondents see hold page https://thefieldbase.com/s/pid-00127?lang=ja-JP The two kinds of link your PM hands out,
one copy away.
Fieldwork keeps the live respondent links (one per language, with their own fielding gate) side-by-side with the published report links — the snapshot-pinned, read-only tokens that stakeholders use to open a dashboard without a login.
- Live and test links per language. Copy the right one to the right place — panel vendor, QA Slack, your own browser. Each respects its language's own fielding status.
- Published reports surface here too. Every non-revoked share from the Reports tab is listed with its read-only
/r/:tokenURL. Snapshot-pinned at share time — env, status, cut, and date window locked, so a shared link can't quietly widen to the open API. - Revoke from the same panel. One click revokes a share. The link stops working for every recipient; the viewer sessions it minted expire. Nothing to republish.
…/s/pid-00127?lang=en-US …/s/pid-00127?lang=en-US&tester=1 …/s/pid-00127?lang=ja-JP /r/tp-ab12cd34ef /r/ct-77aa33bb21 /r/oe-5f9d2c8e14 /r/cb-99ee77bb55 The PM's cockpit, built in
Fieldwork is the view the project manager lives in while responses come in. The programmer wires the survey and the quotas, but the PM is the one who sees the field move and needs to react — bump a target, close a cell, pause a language, hand a stakeholder the right report link. Those actions all land where the engine already enforces them, so nothing drifts between the room where the field is run and the one where the data is collected.